Tuesday, 7 January 2014

Learning progress 6

Throughout the process of learning new knowledge and technology, I realized it's not attainable to have a big project idea with a limit timeline. Before that, I've minimize from 4 characters to 2 characters as well as changing the stories.However, it's still a large scale of character rigging and animation so in order to achieve a measurable project I decided to switch to my Plan B. I decided to shorten my story line which only focus on important scenes since Red Riding Hood is a general old folk story. So, I plan to make it in a fun way instead of repeating the story all over again.

Moreover, I'll be using Red Riding Hood as the only character to interact with the user. As for the user experience, user will be playing as the role of wolf to capture Red. There are a list of weapons for user to choose which kind of attack they prefer. It's a pleasure to receive advice from Joanne where she would
try to understand our working method and personality and  refresh back to the theory of smart target which I supposed to apply it into my learning progress.

On the other hand, I requires to refresh back to theory of smart target. attainable and measurable for my future project. What most important is being self awareness when comes to attainability. I need to ensure
 my ability to achieve a project based on the timeline given. By breaking up the strength : detail  and weakness: slow pace, somehow I need to balance both of them so from there I either go for less pages more detail or less details more pages.





No comments:

Post a Comment